Spent the day in the garage doing some more. In reality it would be a 3 hour job to lay a full floor with all the cutting. But with a full garage it's like that tile sliding puzzle game with one free space, except every piece weighs half a ton and you dare not scratch it. It's looking quite nice once you start getting the cuts done and finishing it off. I probably have another half a day to finish it. Oh, and the free tile samples I got through the post make a great garage coaster.
Did about 1,000 miles on it in 2017. Never used it at all last year as I was getting about on the Hyperstrada most weekends. I kick it over a couple of times a year.
Finally done Checker plate down under heavy items so hopefully this doesn't happen again. And I have washed the garage doors.
Hi Looks good... 1 suggestion... for the bike lift - fit flat stainless plates that are bigger... that way you can move lift out from the bench so you can get all around bike to work on it... i.e. roll it forward.... Just a thought..
There was a mini beer fridge there, which I've since moved. If the plug was lower, it would hit a part of the fridge, but obviously wasn't seen previously.