It's starting to look like it's getting there now, just need to save some money & then get the exhaust system made now that the engine is in it's final resting position, i.e. aligned with the rear wheel, gearbox & primary drive.
The charging system arrived yesterday so I got that fitted today. The kit comes with the stator, the rotor, the regulator/rectifier & shim kit. The large diameter washer that fits between the rotor & engine drive pulley was too thick to give me the correct pulley/clutch drum alignment so I'll make a suitable sized washer from a piece of stainless steel. Hopefully that will give me perfect alignment for the primary bely drive. The bike is booked in for the beginning of next month to have the exhaust pipes made & apart from the painting, that will be the last big job. All that I'll need then to get it running is the magneto, which have gone up considerably since I last bought one !!
Got a call to say the bike is ready for collection after having the exhaust made. Another job ticked off the list !!
Sorry for the late reply, I've been a bit busy lately ! The exhaust was made by OJZ Engineering. If you want to see him at work he has a YouTube channel, "Lancethegass". He, Lance, made the exhaust for the first bike I built & his work is excellent so I had no qualms about getting him to do the exhaust for this build too.
No worries... I was in no need of an immediate answer. I'm presently refurbishing the V-Raptor and am keeping me eye open for exhaust fabricators for future reference. So Lance has been duly noted.