Mine took 2 weeks. Theyre still in the box they came in. Had to send a section back as they mistook a part for an inner sleeve and never coated it. I will have it back by Wednesday I have been assured. Waiting for TNT to pick it up as we speak. Easy mistake to make as it looks like an inner sleeve. Pics will follow their return and install. Asides from that a set of 748R Galfer discs with a 15mm offset for my 916 and a corresponding new set of HEL brake lines.
Waiting for the bad weather to come to force the hyper off the road then ill be getting those done in black.... I can only gather that the RSV pipes took 6 weeks cos I asked for blue - they must have thought...."fuck - no one ever ask's for that!"
Bought a left hand ducati monster brembo caliper for my 525 supermoto conversion....its a bit of leap of faith as ive just sent 60 quid off to someone in Greece whose going to send me a lump of carved billet to convert the front brake to take the said radial caliper along with a 330mm disc for the stopping duties...whether it works or not is another thing but that's the beauty of bike building!!
yup- like that....that's my next mod....dunno about the shoes though....last time I wore a Harrington was in school...
An Ohlins steering damper with Harris mounting brackets for KR No 2. Looks pretty good for £100 but I will be giving it a bit of TLC - it might even have to go black. I can make the Fireblade mounts fit as the frame isn't made yet :Happy: